Interior and exterior decorating for homes, shops and offices, plus the heavy duty floor and surface coatings that commercial premises actually need. Walls prepared before they are painted, floors coated in one continuous finish, and the work sequenced around trading hours so a shop or office is not out of use while it happens.

Filling, sanding and sealing done before a brush is opened, because a finish is only ever as good as what is underneath it.
Floor and surface coatings specified for premises that take trolleys, pallet trucks and daily footfall rather than for a spare bedroom.
Inside and outside, homes and commercial premises, with the right product for the surface and the weather it has to stand up to.
Sections taken at a time, overnight where needed, so the premises stays open while the work goes on.




Yes, both. Domestic decorating is straightforward work and we are happy to take it on, though a good part of what we do is commercial: shop interiors, offices, communal areas and the heavy duty floor coatings that go with them. The approach is the same either way, which is that the preparation gets the time it needs before anything is painted.
It is a hard wearing coating laid over a prepared concrete or screed floor to give a sealed, cleanable surface instead of bare dusty concrete. If you have a unit, a warehouse or a back of house area where the floor is shedding dust, staining or impossible to clean, a coating solves it. In a domestic setting it is rarely the right answer, and we will say so rather than sell you one.
It depends on the product and the temperature, but you should plan on the area being out of use for at least a day or two, longer before heavy traffic goes back on it. We will tell you the actual figures for the product we are using before we start, because there is no point coating a floor on Friday if pallets are going on it Saturday morning.
Usually, yes, by taking it in sections and working out of hours where the area cannot be closed off. Shop floors, aisles and communal areas are normally done overnight or before opening, with the area cordoned, the fumes managed and everything cleared before the doors open again.
Yes, on both homes and commercial premises, weather permitting. Exterior work lives or dies on preparation and timing: paint going onto a damp or dirty surface, or going on too late in the year, will not last however good the product is. We will tell you if the time of year is wrong for it rather than take the money and let it fail.
Yes, and it is normally where most of the time goes. Cracks filled, damaged plaster made good, holes patched and everything sanded and sealed before any finish coat. Painting straight over a poor surface saves a day and costs you the whole job, so it is not something we skip to hit a lower price.
Open 24 hours · Free quotes · All trades